Customization: | Available |
---|---|
Item: | Medical Waste Incinerator Price |
Metal: | Steel & Firebrick |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Medical Waste Incinerator, Hospital Waste Garbage Incinerator
1) Hospitals
2) Hotels
3) Stations
4) Industries
>>Features:
1.Smokeless and no harmful to environment.
2.Continuously and fully burning.
3.Simple operation.
Advantage
1) Long lifetime
2) Totally enclosed operation
3) Suitable for treating infectious waste
4) Avoid secondary pollution
5) Simple operation
Main features
1) Both gas-motivated and oil-motivated are all can be preferred according to customers' needs.
2) Gasified incineration is used for burning syringe, paper waste, bandage, absorbent cotton and other medical wastes.
3) Daily waste can be burned once by gasified incineration.
4)Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust (lower than International standard).
5) Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.
>>Detail Information:
Medical refuse Incinerator:
Item |
Spec. |
Applicable hospital size (number of beds) |
300-500 beds |
Burning Ability |
200-300kg/time (3-6 times/day) |
Size of the Burner(m) |
2.2L*1.4H*3.8B |
Volume of the Burner |
Gas room 2.4m³,Secondary burning room 1.2m³ |
Chimney |
Height 10m,Outer diameter 400mm |
Air blower |
1.1kw |
Combustion burner |
0.22kw, fuel consumption 6-10kg/h |
Re-combustion burner |
0.37kw, fuel consumption 10-20kg/h |
Running-voltage |
220V or 380V |
Weight |
About 8000kg |
The product is mainly suitable for solid medical waste (including pollution), waste plastic and rubber etc, at high temperatures they can be divided into organic compounds.
we can offer all kinds of waste incinerator for industrial waste, medical waste, chemical waste and daily waste at any capacity.
>>Standard Configuration:
No | Name | Amount | Specifications | Notes |
1 | Incinerator | 1 | A3 steel refractories | Main part |
2 | The 2 combustion chamber and the combustion chamber mixed | 1 | A3 steel refractories | Installed in the main body |
3 | Electric box | 1 | The main body | |
4 | Fluegas purification system | 1 | A3 steel refractories | Installed in the main body |
5 | Combustion burner | 1 | BTL-10 | The main body |
6 | Reburning burner | 1 | BTL-26G | The main body |
7 | blower | 1 | 1100W/220V/380V | The main body |
8 | Ash rake | 1 | 200mm×3000mm | Shandong green |
9 | Pump | 1 | The main body | |
10 | fuel tank | 1 | The main body | |
11 | fuel tank bracket | 1 | 500mm×2200mm | Shandong green |
12 | Chimney | 2 | 400mm×5000mm 400mm×5000mm |
Shandong green |
13 | Filter switch | 5 | The main body | |
14 | Thermocouple | 2 | 1200°C | The main body |
15 | Operational procedures | 1 | The main body |
Model No. | MCFS-20 | MCFS-30 | MCFS-50 | MCFS-50X | MCFS-100 | MCFS-150 | MCFS-300 | MCFS-500 |
Applicable hospital size (number of beds) | 30-50 beds | 50-100beds | 100-200beds | 150-250beds | 200-300 beds | 200-300beds | 300-500 beds | 600-800beds |
Burning Ability | 10-20kg/ times (3-6 times/day) |
20-30kg/ times (3-6 times/day) |
30-50kg/ times (3-6 times/day) |
50-80kg/ times (3-6 times/day) |
80-100kg/ times (3-6 times/day) |
100-150kg/ times (3-6 times/day) |
200-300kg/time (3-6 times/day) | 300-400kg/ times (3-6 times/day) |